Using an auger with a digger derrick involves several critical safety and operational steps, but the key action that ensures safety and efficiency before beginning operation is to retract the boom and rotate it to clear the swing area, followed by moving the auger control to the DIG position. This procedure is essential for several reasons.

First, retracting the boom helps to reduce the risk of collisions with nearby objects or personnel. It prepares the equipment for safe operation by ensuring that the boom is in a position that minimizes any potential hazards during the digging operation. Rotating the boom to clear the swing area further enhances safety by ensuring that there is ample space for the auger to operate without interference.

Additionally, moving the auger control to the DIG position indicates readiness for operation, ensuring that the auger can be effectively engaged and controlled. This step not only confirms that the operator is prepared to engage the tool but also aligns with the necessary operational protocols to ensure safe digging practices.

While performing a system check, inspecting the auger for damage, and testing the auger in an empty area are all important safety measures, they typically follow the initial action of adjusting the boom and preparing the auger for the task. The focus on clearing the swing area emphasizes paramount safety